CNG Form 1501 must be submitted within 10 calendar days after the installation of a compressed natural gas (CNG) facility or equipment. This requirement is in place to ensure that regulatory bodies are promptly informed of new CNG installations, enabling them to perform necessary inspections and assessments in a timely manner. Submitting the form within this timeframe helps maintain compliance with safety regulations and ensures that the installations meet the required standards for operation.